Quick Highlights
- ✓ N-Type TOPCon cell technology
- ✓ Higher efficiency in low-light conditions
- ✓ Lower temperature coefficient
- ✓ Reduced degradation over lifetime
- ✓ Bifacial design for additional energy gain
Warranty Coverage
15-year product warranty, 30-year linear power output warranty (84.8% at year 30)
All Features
- ✓ N-Type TOPCon cell technology
- ✓ Higher efficiency in low-light conditions
- ✓ Lower temperature coefficient
- ✓ Reduced degradation over lifetime
- ✓ Bifacial design for additional energy gain
- ✓ 30-year linear power warranty
Certifications
Jinko Solar Tiger Neo N-Type
Premium N-type TOPCon solar panels with industry-leading efficiency and performance.
Select Power Output
Technical Specifications
Product Documents
Tiger Neo N-Type Datasheet
2.4 MB
Product Warranty Certificate
850 KB
Installation Manual
5.1 MB
Why Choose Jinko Solar Tiger Neo N-Type?
Maximum Energy Production
High-efficiency panels designed for Australian conditions deliver optimal output year-round.
Industry-Leading Warranty
Backed by comprehensive product and performance warranties for long-term peace of mind.
CEC Approved Quality
Clean Energy Council approved panels that meet strict quality standards and rebate requirements.
Professional Installation in ACT & NSW
Installation Process
Free Site Assessment
We evaluate your property, electrical system, and usage to recommend the best configuration.
Permits & Approvals
We handle paperwork, network applications, council permits and compliance documentation.
Professional Installation
CEC-accredited installers complete the system to high safety and quality standards.
Testing & Commission
We test the system, connect to the grid, and hand over training on operation and monitoring.
What's Included
- Solar panel mounting systems and all hardware
- Electrical safety compliance and testing
- Network connection application and approval
- CEC-compliant installation documentation
- System monitoring setup and training
- 10-year workmanship warranty
- Post-installation support and service
Installation Timeline
Typical solar panel installation takes 1-2 days after approvals. Full process from quote to connection: 4-8 weeks.
Frequently Asked Questions
Get Expert Installation in ACT & NSW
Professional solar panel installation throughout Canberra, Queanbeyan, Goulburn, and surrounding areas within 200km of the ACT border.
Over 10 years experience • 1,000+ solar systems installed • CEC Accredited • Fully Insured